BUILD THE SHARED SITE BRIEF
Use neutral labels and ordinary descriptions. Do not measure, inspect or enter a work area for this pack.
Construction & Specialty Trades · FREE PREPARATION PACK
Two paving proposals can cover different areas, site preparation, adjacent work and operating impacts even when their totals look comparable. This helpful preparation resource from PickYourPro.ai gives each pro the same neutral Site A brief and keeps provider-defined areas, alternatives, access, phasing, coordination and closeout questions together. It does not design, measure or approve paving work.
Download free PDF ↓Ready for proposals? Start a request ↗
Preparation only. Do not inspect, measure or enter a work area; diagnose pavement; select a paving system, material, layer, thickness, base, drainage detail, marking or traffic-control method; define permits, accessibility or code; authorize work; decide reopening; or provide engineering, safety, contract, legal or financial advice. Use neutral site and area labels. Qualified providers and current authorities must assess, design, coordinate, document and approve the actual work.
START HERE
Use Site A and Area A labels rather than an address. Describe ordinary site use, known access windows and available records without entering a work area or deciding what treatment is needed. Ask each pro to identify the areas it assessed, define its proposed alternative, list included preparation and adjacent restoration, and explain how access and operating impacts would be handled. Keep a base proposal and every alternate separate. Record who coordinates with property management, utilities or current authorities, but do not decide those responsibilities yourself. An open question stays open until the appropriate provider or authority answers it. A note here is not authorization, a traffic plan or reopening approval.
Open the PDF in a form-capable viewer, save a copy, then fill it in. Reopen your saved copy to check your answers. You can also print the blank pages and write by hand. Your answers are not submitted to PickYourPro.ai.
Use neutral labels and ordinary descriptions. Do not measure, inspect or enter a work area for this pack.
Let the provider define the technical scope. Keep every alternative and responsibility visible in writing.
Tick what is organized for comparison. These checks do not approve design, work-zone controls or reopening.
Ask each provider the same area, alternative, access, coordination and closeout questions.
Use Provider A and B. Clarify unlike areas and responsibilities before comparing proposal totals.
USE IT RIGHT NOW
Write down the answers and any exclusions. If two proposals describe different work, clarify the difference before comparing their totals. Leave unanswered points blank until the professional confirms them.
A CLEARER NEXT STEP
Create an account on PickYourPro.ai only if you choose, then start an Asphalt & Paving request. Share a non-sensitive site, area and responsibility brief so participating pros can compete with proposals. Compare provider-defined areas, alternatives, included work, access and phasing roles, coordination, timing, written terms and fit. A provider-led site and records review may be needed before a final proposal.
Start a new request ↗Participation and availability vary. A provider-led site, access and records review may be needed before a final proposal.
The worksheets are free to use whether you hire through PickYourPro.ai or elsewhere. No account is needed to download them.
Download the five-page pack ↓One request. Every pro’s best offer.
These are original planning prompts, with AI assistance, prepared by PickYourPro.ai. Official links checked October 23, 2026. This pack has not been independently reviewed by a licensed specialist.
Official consumer guidance checked October 23, 2026. It supports comparing written descriptions of work and asking about material differences between estimates. This workbook does not reproduce state contract rules or payment advice.
Official federal planning context checked October 23, 2026. It supports making access, phasing and work-zone-impact responsibilities explicit. This client workbook is not a transportation management plan and does not provide traffic-control instructions.
Linked organizations do not endorse PickYourPro.ai. Report a correction.