MAP THE UTILITY PURPOSE AND CORRIDOR
Use neutral labels. Keep addresses, locate tickets, exact alignments, maps and access details outside.
Construction & Specialty Trades · FREE PREPARATION PACK
A utility trench proposal can leave gaps when the requested utility, corridor, existing installations, excavation work and final restoration are discussed separately. This helpful preparation resource from PickYourPro.ai creates one neutral Corridor A brief. It helps the client identify responsibility questions for the utility owner, locate process, qualified excavation team, connected trades, inspection, testing and restoration. It does not locate utilities, classify soil, design a trench or direct field safety.
Download free PDF ↓Ready for proposals? Start a request ↗
Preparation and proposal comparison only; not utility-locate, trench, excavation, soil, protective-system, shoring, access, traffic-control, confined-space, hazardous-atmosphere, dewatering, structural, civil-engineering, construction, inspection, permit, code, safety, emergency, insurance, contract or legal advice. Keep addresses, ticket numbers, utility maps, exact alignments and access details out. Utility owners, locate services, employers, competent persons, engineers, trades and local authorities must plan and control actual work.
START HERE
Use neutral labels such as Corridor A, Endpoint A, Utility Owner A and Surface A. Keep addresses, ticket numbers, utility maps, exact alignments, access codes and private plans outside. Describe the service purpose and visible surface or access conditions without guessing what is underground. Ask utility owners, official locate services, employers, competent persons, engineers, trades and local authorities to confirm actual locations, requirements, work controls and acceptance.
Open the PDF in a form-capable viewer, save a copy, then fill it in. Reopen your saved copy to check your answers. You can also print the blank pages and write by hand. Your answers are not submitted to PickYourPro.ai.
Use neutral labels. Keep addresses, locate tickets, exact alignments, maps and access details outside.
Do not guess underground conditions or safety methods. Assign each decision to the appropriate qualified party.
Tick what is organized. These checks do not authorize digging or approve a locate, design, protective system or work method.
Record the answer and where it appears in the proposal, work plan or closeout record.
Use Provider A and B. Clarify unlike locate, work-control or restoration assumptions before comparing proposals.
USE IT RIGHT NOW
Write down the answers and any exclusions. If two proposals describe different work, clarify the difference before comparing their totals. Leave unanswered points blank until the professional confirms them.
A CLEARER NEXT STEP
Create an account on PickYourPro.ai only if you choose, then start an Excavation request for Utility trenches. Share the same non-sensitive Corridor A brief so participating pros can compete with proposals. Compare utility and locate coordination, qualified work-control ownership, access, excavation, material handling, testing, restoration, records, exclusions and fit. Private site plans and qualified utility, excavation, engineering, trade and local-authority review may be needed before a final proposal.
Start a new request ↗Participation and availability vary. Private site plans and qualified utility, excavation, engineering, trade or local-authority review may be needed before a final proposal.
The worksheets are free to use whether you hire through PickYourPro.ai or elsewhere. No account is needed to download them.
Download the five-page pack ↓One request. Every pro’s best offer.
These are original planning prompts, with AI assistance, prepared by PickYourPro.ai. Official links checked October 30, 2026. This pack has not been independently reviewed by a licensed specialist.
Official OSHA overview checked October 30, 2026. It supports assigning excavation planning and protective decisions to employers and competent persons; this client workbook does not reproduce safety instructions or determine compliance.
Official OSHA standard route checked October 30, 2026. It supports including underground-installation and utility-owner coordination in pre-work responsibility questions; this workbook performs no locate and gives no field direction.
Linked organizations do not endorse PickYourPro.ai. Report a correction.